REPORT ON RESHAPING AND SPOT IMPROVEMENT OF ASIWA FILLING STATION AND THE BOSOME SENIOR HIGH TECHNICAL SCHOOL ROADS
1.0 INTRODUCTION
The Department was tasked to reshape the deteriorated internal roads at the Bosome Senior High Technical School (BSHTS) at Asiwa and spot improvement of some parts of Asiwa – Achiase road, specifically at the Nujenix Filling Station.
2.0 LENGTH OF ROAD
The road is estimated to be 0.4Km
3.0 EQUIPMENT AND MATERIALS USED
The grader and Roller were used. Also, stones and gravels were used to fill the ditches at the Filling Station, ramped and road reshaped.
4.0 DURATION
In all, one day was used for the project.
5.0 CONDITION OF ROAD BEFORE AND AFTER RESHAPING
Below is the state of the road before and after reshaping and spot improvement
5.1 NUJENIX FILLING STATION.

Gravels pawed into ditches ready for spreading by grader

Gravelling under way

ROAD AFTER SPOT IMPROVEMENT

Roller ramming the fill for compaction
5.2 BOSOME SENIOR HIGH TECHNICAL SCHOOL (BSHTS)
Condition before reshaping

CONDITION OF ROAD AFTER RESHAPING